The Roof Replacement Process – Asphalt Shingles
Replacing any roof is a pretty straightforward process. It really comes down to 3 steps: Remove Old Roof, Install New Roof, and Clean Up.
But within these three steps there are lists of sub-steps that need to be followed in order to ensure a quality installation.
The below example is a standard asphalt shingle roof replacement.
Before the install: |
- Email and text reminders that the install date is coming up.
- Double-check the weather to make sure it won’t rain.
- Materials are Delivered 1-2 days before work is scheduled.
- Take photos of the house and materials to make sure everything was delivered.
|
Remove Old Roof: |
- Set up landscape and HVAC unit protection.
- If needed, move furniture and outdoor belongings to a safe location.
- Set up ladders and other roof climbing equipment.
- Tear off old shingles, valley protection, felt, and all other accessories.
- Inspect and replace any piece of plywood that are rotting or too weathered.
- Dump all old shingles, nails, vents, etc in dumpster.
|
Install New Roof: |
- Set up equipment elevator. Install H-clips or re-nail plywood where needed.
- Install Ice & Water Shield in all valleys and high-flow areas.
- Install and dry-in synthetic felt.
- Install Drip Edge and Starter strip on eaves and rakes.
- Chalk lines on roof to ensure shingles get installed in a straight line.
- Install field shingles, trimming or weaving where necessary.
- Install new flashings where necessary.
- Seal and waterproof all pipe boots and protrusions.
- Install Ridge vents
- Install Hip & Ridge Cap shingles
|
Clean Up: |
- Blow off excess debris and cutoffs from roof and gutters.
- Throw all debris, material wrappers, and waste into dumpster.
- Sweep the perimeter of the home with magnetic bars to pick up as many nails as possible.
- Inspect the siding of the home and clean any scuff marks.
- Take photos of the completed roof.
- Walk around the home with the property owner to ensure satisfaction.
|